Search

Brickworks Masterplan Update

DOMA is encouraged by the comments from community and authorities following the Environmental Impact Statement’s public notification period coming to an end.


Through this process we have learnt that TCCS and the ACT Emergency Services require a 7.5m wide dual carriage edge road to run along the south-western boundary of the Brickworks site from Denman St to the Brickworks access road off Dudley St (now officially named Brickworks Way). This has impacted DOMA's approach to the master planning of this area. This south-western pocket of the site was previously planned to contain two apartment buildings with 32 apartments in each. The new masterplan for this area has replaced these apartment buildings with townhouses and two additional housing blocks along Denman St.

It is important to both DOMA and the community that this new road is not used by vehicles to take a shortcut or “rat-run” through Yarralumla. To mitigate this risk removable bollards have been included to provide “dead ends” to these roads whilst being able to maintain through access by Emergency Services and ACT Government vehicles if/when required.

DOMA plans to submit this updated quadrant of the masterplan in the EIS response as well as the Draft Estate Development Plan submission and encourage any comments to submitted via the feedback form on this website by Monday 11 October. These comments will circulate within government eventually allowing Doma to submit a Final Estate Development Plan for Development Approval which will be publicly notified. There will be a public information evening held prior to this submission (likely early in 2022).

View the proposed masterplan changes (PDF document download)


Brickworks Update to Masterplan 280921 compressed
.pdf
Download PDF • 10.10MB

81 views0 comments

Recent Posts

See All